Antalya Gençlik ve Spor İl Müdürlüğü - Manavgat Yarı Olimpik Havuz
Antalya / Manavgat
2022
Antalya Gençlik ve Spor İl Müdürlüğü - Manavgat Yarı Olimpik Havuz
Project Specifications
2022
Project Name
Antalya Gençlik ve Spor İl Müdürlüğü - Manavgat Yarı Olimpik Havuz
Client / Facility
Antalya Gençlik ve Spor İl Müdürlüğü - Manavgat Yarı Olimpik Havuz
Location
Antalya / Manavgat
Year
2022
Scope of Engineering Work
10 swimming pools (712 m³) · Aquatower and 8-slide circulation (205 kW)
Project Details
Filtration, mechanical and electrical installation works were completed for 10 swimming pools. Total water volume: 712 m³. Electromechanical installation of the circulation system for the Aquatower units in the two children's pools and 8 slides was completed. Total installed circulation power: 205 kW.