Antalya Gençlik ve Spor İl Müdürlüğü - Manavgat Yarı Olimpik Havuz Antalya / Manavgat 2022

Antalya Gençlik ve Spor İl Müdürlüğü - Manavgat Yarı Olimpik Havuz

Project Specifications

2022
Project Name Antalya Gençlik ve Spor İl Müdürlüğü - Manavgat Yarı Olimpik Havuz
Client / Facility Antalya Gençlik ve Spor İl Müdürlüğü - Manavgat Yarı Olimpik Havuz
Location Antalya / Manavgat
Year 2022
Scope of Engineering Work 10 swimming pools (712 m³) · Aquatower and 8-slide circulation (205 kW)

Project Details

Filtration, mechanical and electrical installation works were completed for 10 swimming pools. Total water volume: 712 m³. Electromechanical installation of the circulation system for the Aquatower units in the two children's pools and 8 slides was completed. Total installed circulation power: 205 kW.